Location: Duong Noi Urban Area – Ha Dong District – Hanoi
Project Overview
The AEON Mall Ha Dong project is one of Shindomei Vietnam’s major commercial works involving 10,000 m² of concrete floor hardening coating and indoor & outdoor parking line marking.
The project required high precision in flatness, gloss, load resistance, and durability, while maintaining aesthetic appearance and traffic safety throughout the parking zones.
Our Solution
- Applied two-component epoxy hardening system with high adhesion and mechanical strength.
- Surface grinding and preparation to achieve optimal flatness and coating quality.
- Executed line marking (indoor & outdoor) with long-lasting reflective paint.
- Completed within a tight schedule without disrupting mall operations.
Results
✅ Increased surface hardness by over 40%.
✅ Smooth, glossy floor finish for easy cleaning and visual appeal.
✅ Fully met AEON Japan’s safety and quality standards.
✅ Delivered 5 days ahead of schedule.
Client Testimonial
“The project was completed faster than planned with outstanding quality.
The floor finish and parking line markings perfectly met AEON Japan’s requirements.”
— AEON Mall Ha Dong Management Team
