
Location: Thang Long I Industrial Park – Hanoi
Project Overview
The Sakurai Vietnam project was carried out by Shindomei Vietnam to renovate and reinforce the factory’s machine base system to meet the high operational demands of heavy industrial equipment.
The work required precise structural alignment, ensuring flatness, vibration resistance, and load-bearing capacity, while keeping the factory in full operation.
Our Solution
- Conducted precise surveying and structural inspection of existing bases.
- Cutting, reinforcement, and re-casting with high-strength concrete.
- Installed anchor bolts, steel mesh, and anti-vibration finishing layer.
- Executed night-time construction to avoid production downtime.
Results
✅ Achieved ±2 mm flatness tolerance per technical requirements.
✅ Enhanced stability and vibration resistance for machinery.
✅ 100% safe operation during construction.
✅ Delivered on time, meeting Japanese JIS standards.
Client Testimonial
“Shindomei’s precision and professionalism exceeded expectations.
The construction quality and coordination were excellent.”
— Representative of Sakurai Vietnam Co., Ltd.
