Location: Duong Noi Urban Area – Ha Dong District – Hanoi

Project Overview

The AEON Mall Ha Dong project is one of Shindomei Vietnam’s major commercial works involving 10,000 m² of concrete floor hardening coating and indoor & outdoor parking line marking.
The project required high precision in flatness, gloss, load resistance, and durability, while maintaining aesthetic appearance and traffic safety throughout the parking zones.


Our Solution

  • Applied two-component epoxy hardening system with high adhesion and mechanical strength.
  • Surface grinding and preparation to achieve optimal flatness and coating quality.
  • Executed line marking (indoor & outdoor) with long-lasting reflective paint.
  • Completed within a tight schedule without disrupting mall operations.

Results

✅ Increased surface hardness by over 40%.
✅ Smooth, glossy floor finish for easy cleaning and visual appeal.
✅ Fully met AEON Japan’s safety and quality standards.
✅ Delivered 5 days ahead of schedule.


Client Testimonial

“The project was completed faster than planned with outstanding quality.
The floor finish and parking line markings perfectly met AEON Japan’s requirements.”
AEON Mall Ha Dong Management Team